Customer:
Dr. P. Phillips Hospital
LOCATION:
Orlando, FL
Scope of Work:
Armstrong International worked with the designer to size and subsequently supply a packaged system for an existing hospital. The Armstrong solution included instantaneous hot water generation, with temperature control within +/-2 degrees of set point to the building.
The original system was twenty plus years old, and included two large storage tanks with integrated heat exchangers a hi-low mixing valve system, steam valves, pumps and steam traps.
Upgrade Projects:
-
Designed the replacement system to fit within a constricted space
-
Provided 400 gpm blended water at 122°F to the potable system, and 30 gpm to the kitchen
-
Provided an integrated BAS interface
Terms:
The system was installed in 2008.
Benefits:
The package shipped in two pieces had 200+ solder joints, three heat exchangers, six mixing valves, two building return pumps, steam traps, balancing valves, strainers... and not one leak!