Operation and Maintenance Services through Multiple Energy Conservation Projects

Customer:

Covidien

LOCATION:

Raleigh, NC

Scope of Work:

Armstrong International developed, engineered, and installed six energy conservation projects at Covidien’s Acetaminophen Facility.

The projects were financed by Armstrong over a five year term. Armstrong provides monthly engineering review and maintenance support for the heat recovery and steam distribution systems.

Upgrade Projects:

  • Engineered and installed eleven condensate contamination sensors/dump valves to dump condensate for boiler protection

  • Engineered and installed an automatic boiler blowdown system

  • Engineered and installed a D/A vent condenser

  • Engineered and installed air compressor heat recovery for boiler air preheat

  • Engineered and installed boiler oxygen trim controls

  • Implemented a steam trap optimization program

Terms:

Five-year engineering and maintenance term began in May 2000.

Benefits:

Armstrong projected annual savings of $364,000 for the projects, but Covidien was able to document in excess of $500,000 in energy savings. Financing, provided by Armstrong, enables savings to immediately offset costs and eliminate a large capital outlay.

Region: 
~ North America
Industry: 
Pharmaceutical
Solution type: 
Turnkey Installation