Customer:
GE Plastics
LOCATION:
Burkville, AL
Background:
Armstrong International performed a composite audit of the utility services at the GE Plastics Facility in Burkville, Alabama. Maintenance monitoring audits shall be performed on a quarterly basis with a focus on energy conservation.
Scope of Work:
-
Tracing
-
Plant wide steam tracing system design recommendations
-
Quarterly audits shall include monitoring tracer circuits and steam condensate manifolds with engineered P&ID updates
-
-
Insulation
-
Plantwide utility piping insulation
-
Quarterly inspections to maintain best in class
-
-
Steam Traps
-
Plantwide steam trap population
-
Quarterly inspections to maintain energy conservation efficiency
-
-
Compressed air and N2
-
Plantwide air and nitrogen systems
-
Quarterly inspections shall include maintenance monitoring of potential leaks
-
-
Cooling water survey and Delta-T-Optimization
-
Plantwide cooling water survey
-
Quarterly inspections of temperature indicators, pressure indicators and heat exchanger optimums (Delta-T) for energy conservation efficiency
-
Benefits:
GE Plastics recognized substantial annual energy cost savings by implementing best in class utility maintenance and relying on an intelligent monitoring database. GE Plastics also improved utility piping/insulation system efficiency and reduced the number of unscheduled maintenance. GE’s maintenance personnel’s efficiency has also been enhanced.
