Background:

During the VA Medical Center visit, Armstrong's audit team, with the valued assistance of Campbell-Sevey personnel, identified, analyzed and developed Energy Conservation Measures (ECM’s) for this program. For each ECM, Armstrong performed detailed field engineering and presented the facility with an Engineering Approval Package (EAP), containing a general arrangement drawing, depicting the plant modifications along with the technical back up. Site personnel subsequently approved and released the individual ECM’s to ASI for implementation, as part of the overall program.

Scope of Work:

Several ECM’s were implemented, through the installation of quality products and services by Armstrong:

ECM 1 – Boiler Stack Economizer
ECM 2 – Boiler Continuous Blowdown
ECM 3 – Deaerator Vent
ECM 4 – Coils and Heat Exchangers
ECM 5 – Steam Traps
ECM 6 – Laundry Wash Water Recovery
ECM 7 – Trip Valves

Benefits:

The VA Hospital was able to reduce a significant amount of energy losses by the capture and recovery of steam and condensate. The ECM’s were implemented on time, and was a complete turnkey solution for the hospital.





Resource Library
Resource Library
Contact Us
Contact Us
Find a Rep
Find a Rep
Request a Quote
Request a Quote
System Assessment
System Assessment
Calculators
Calculators
View Cart
View Cart