Scope of Work:
Armstrong Service engineered, designed, and installed a Process Hot Water System for Gorton’s Seafood plant expansion.
Upgrade Projects:
- Installed a 4,000,000 BTU Armstrong Flo-Direct® Hot Water Heater
- Installed Transfer Pumps
- Installed FRP 1,500 gallon storage tank
- Installed a pressure booster pump system with manual start-stop control
- Installed all required auxiliary piping
- Installed (6) wash station drops and hose reels
Contract:
The value of the Agreement was $140,000.
Time of Service:
Project was completed in September, 2003.
Benefits:
Gorton’s site management wanted to concentrate on the requirements of the plant expansion and welcomed Armstrong turnkey capabilities. Further, Gorton’s received a hot water heating system that is 98% efficient.