Scope of Work:

Armstrong International designed, engineered, and installed a complete condensate return solution to correct the persistent water hammer problem the site encountered. Plant engineering, as well as site contract engineering, had been trying to solve the continuous water hammer problem for years.

Upgrade Projects:

  • Engineered and installed (4) separate condensate pumping stations
  • Engineered and installed (2) separate flash tank stations
  • Engineered and installed re-runs of multiple condensate lines
  • Insulated all condensate lines
  • Recommended, replaced, and properly sized steam traps
  • Engineered and installed air vents on all heat exchangers

Contract:

The value of the project was $850,000.

Time of Service:

Project was completed in January, 2003.

Benefits:

The water hammer problem was corrected. Dow enjoyed energy savings from the project as well as faster heat-up times in the heat exchangers. Additional, sections of the plant will now receive the same review and effort.





Resource Library
Resource Library
Contact Us
Contact Us
Find a Rep
Find a Rep
Request a Quote
Request a Quote
System Assessment
System Assessment
Calculators
Calculators
View Cart
View Cart