Back to Partnership Profiles Index

Bank of China

H.Q. Building

Beijing, P.R. China

Scope of Work:

As the magnate of Banking Industry in China, Bank of China follows high standards in office building design.  Its central air conditioning system, designed by overseas engineering firms, included a humidification system to provide protection for precision telecommunications equipment and valuable paper, while improving human comfort.

Upgrade Projects:

Central steam supply is not available.  In addition, the humidification system needs to be integrated into the overall BA system.  After evaluation among international brands, Armstrong’s series EHU-700 electrode-type humidifiers had been chosen to provide humidification for a total area of 60,000 – 70,000m2, covering the office building as well as the treasury.

Terms:

The products were installed July 1999.

Benefits:

“In the past five to six years, since Armstrong humidifiers got installed, almost no maintenance has been needed except the regular tank cleaning.  The humidifiers perform reliably.  The control system works well with our overall BA system.  We enjoy excellent humidification now.”





Biblioteca de recursos
Biblioteca de recursos
Contáctenos
Contáctenos
Représentants
Représentants
Solicitar un presupuesto
Solicitar un presupuesto
Evaluación de sistemas
Evaluación de sistemas
Calculadores
Calculadores
Ver Carro
Ver Carro