CPCU

Paris, France

Scope of Work:

The 480km of steam/condensate piping in the Paris district heating loop was experiencing accelerated piping wear and severe water hammer.  The water hammer was a critical safety concern as well as a source of continual annoyance to over 5000 CPCU commercial/residential customers because of the loud banging.Armstrong International was asked to design a solution to the water hammer problems without causing any service inconvenience for CPCU’s customers.

Upgrade Projects:

Armstrong conducted an extensive audit of the system to include:

  • Data logging of pressure and temperature at different areas of the steam and condensate network to isolate water hammer problem areas
  • Assessment of different working conditions depending on period of the day and period of the year

Following the audit, Armstrong put in place concrete solutions:

  • Design of a custom made steam trap to handle their CPCU’s unique application
  • Design of a tailor-made thermo-siphon mixing device using cooler condensate from return lines to cool hot condensate coming out from drip legs to mitigate the water hammer
  • Armstrong provided Best Practice engineering drawings for CPCU’s main line condensate stations

Investment:

The total value of the agreement was over $250,000 Eur.

Terms:

Project scope began in 2001.

Benefits:

  • Armstrong received an award from CPCU for their product innovation
  • Elimination of water hammer provided CPCU with happier customers and a safer work environment for CPCU maintenance personnel 
  • Reduction of costly unscheduled maintenance
  • Substantial condensate saving
  • Improvement of steam quality and reduction of wear in pipes




Resource Library
Resource Library
Contact Us
Contact Us
Find a Rep
Find a Rep
Request a Quote
Request a Quote
System Assessment
System Assessment
Calculators
Calculators
View Cart
View Cart